FG Unveils New Control Centre to Cut Fault Response Time, Boost Grid Supply

0

 

 

The federal government has said the newly commissioned national control centre is designed to slash the time taken to detect and clear faults on the transmission network, a move officials expect will reduce system collapses and improve the reliability of power supply across the national grid.

The Nigerian Independent System Operator (NISO) on Wednesday, September 30, 2026, flagged off construction of the ultra-modern National Control Centre in Osogbo, Osun State, describing the project as a major step toward strengthening the management and operation of Nigeria’s national grid.

Performing the groundbreaking ceremony on behalf of Vice President Senator Kashim Shettima, his senior special assistant on Legal and Compliance Matters, Alhaji Bashir Maidugu, said the facility underscores President Bola Tinubu’s commitment to developing critical infrastructure under the Renewed Hope Agenda.

Maidugu added that the control centre would help drive socio‑economic development and create a more conducive environment for citizens and businesses by improving the stability and predictability of electricity supply.

“Existing centre is about 60 years old”

Giving an overview of the project, the minister of Power, Chief Joseph Tegbe, said the existing National Control Centre has been in service for roughly 60 years and is no longer adequate for the demands of a modern, evolving power system.

Tegbe said the present administration recognised the urgent need for a modern facility capable of meeting current operational requirements, and called for sector‑wide collaboration and support for NISO so it can deliver reliable and efficient electricity nationwide.

The chairman of the NISO Board of Directors, Dr Adesegun Akin‑Olugbade, described the project as a major milestone in implementing the institutional framework established by the Electricity Act 2023.

He noted that effective delivery of NISO’s core responsibilities—Market Administration, System Operation and System Planning—requires advanced technology, strong governance and robust technical capabilities, all of which the new centre is intended to provide.

MD/CEO: “Dawn of a new era” for grid operations

The managing director/CEO of NISO, Abdu Bello Mohammed, said the groundbreaking marks the dawn of a new era in Nigerian power system operations.

“As Nigeria’s electricity grid grows increasingly complex, we require modern technology, reliable data and skilled professionals to operate it effectively,” Mohammed said.

“This new centre will drastically improve grid visibility, enhance real‑time monitoring and security, and empower our operators to respond to system events with greater speed and precision,” he added, signalling faster fault detection, quicker response times and tighter control over grid disturbances.

Mohammed said the ultra‑modern National Control Centre is designed to provide the advanced operational environment required for a world‑class system operator, with upgraded monitoring, control and security systems to support a more resilient national grid.

Leave a Reply